Future Research Vessel primary mission scenarios

The Primary Mission Scenarios form part of the Concept of Operations provided to the Contractor to assist in their understanding of the tasks RV Investigator will be required to perform when it comes into service.

 


Future Research Vessel – Draft Technical Profile

The following draft specifications were released prior to a contract being awarded.

Research Vessel: Multi-purpose
Length Overall: 88.9 m
Beam: 18.5 m
Draft: 5.5 m
Lloyds Classification: +100A1, +LMC, UMS, Ice 1c, IWS, EP, Research Vessel, DP (AM), DnV Silent R

Crew: 18 TBC 

Science Complement: 40

Gross tonnage: TBA

Australian Register of Shipping Official Number: TBA

DNV Silent-R: The RV-Investigator will operate with low levels of radiated noise to allow for enhanced science operations

Main engines: 4 diesel generators

Capacities: Fuel oil 900 tonnes, fresh water 250 tonnes, fresh water evaporator up to 2 x 15 t/day

Endurance: 60 days

Electrical supply: 690VAC, 415VAC and 240VAC cycle. Full uninterruptable power supply

Propulsion: Two reversible electric propulsion motors driving two slow speed fixed pitch propellers

Dynamic Positioning: DP1 (AM) which allows the vessel to hold station within defined limits

Bow thruster: retractable 1000Kw

Winches: A large suite of scientific winches are available for conducting trawling, fishing, coring, CTD, hydrographic, and towed body operations.

Navigational equipment: A full range of navigational equipment will be employed on the RV – Investigator in accordance with Australian and International standards

Radar equipment: A full range of radar equipment will be employed on the RV – Investigator in accordance with Australian and International standards

Echo sounder: A speedlog and echo sounder will be employed on the RV – Investigator in accordance with Australian and International standards

Communications: In-Mar-Sat Comm, In-Mar-Sat Fleet Broadband voice/fax/data. Iridium ship-to-shore communications system voice/data. NextG phone, Satcom C (GMDSS compliant), HF/MF and VHF radios, weather fax. Possible addition of VSAT for high speed DATA transfer.


Draft General Arrangement

In November 2010, Rev 4 of the Draft General Arrangement was released.

This is a Preliminary General Arrangement of the Research Vessel Investigator. These drawings are indicative and will be subject to amendment throughout the design phase of the Future Research Vessel Project.

Draft General Arrangement


Refined Statement of Functional Requirement for the Future Research Vessel

A detailed specification document provided to Respondents outlining CSIRO’s technical requirements for the proposed Future Research Vessel (FRV).


Follow